How many engineers does one project really need?

I thought I just had one engineering firm on this project.

I know they are my engineers because they send me bills. And they send me reports and stuff. They came by at the very beginning and charged me loads of money to peer down some pits that Ronnie the local digger-driver had dug (They did more than that actually – they also made a lovely detailed contour map of the plot and told me about the water table and where the rock was)

It was really only this week that I discovered that there are actually three lots of engineers working in my project.

I need to write this blog if only to get my head around what happened on Friday.

We are in the final stages of getting a building warrant for the upper building (we’ve had the warrant for the foundations for ages and they are, in fact nearly built) and the SER certificate from the engineer was the final thing we needed. On Friday all the documents came through but there was an extra foundation wall or two in the diagram from what we are in the process of building. This, as you can imagine, is not a negligible difference.
IMG_8114.JPGLook here the foundation walls as we have them

IMG_8774.PNG…and here’s the Scotframe Diagram the builder was working to …. Identical

IMG_8771-0.PNG
….and here’s the final ‘thank-goodness-it-wasn’t’ Engineer’s diagram that arrived on Friday

This probably should have created general panic from me but this came on one of my working days, which contain enough panic and chaos of their own. I’ve managed to compartmentalize life and work so one doesn’t bother the other too much during the 9-5pm, so, instead, I felt a rather distant unease, as if viewing the horror from a far-away planet.

In fact we’d been through something like this before – underneath that lovely screed in the part-finished foundations photo is a beautiful strip foundation. (But that’s another blog…)

It turned out there are engineers working for the timber kit company and still more engineers contracted by the timber kit company. And these engineers don’t seem to talk to our engineers.

Fortunately the architects flagged up the discrepancy to me and I pointed out that our architects could have been working from an earlier plan. With much difficulty we got hold of the various engineers and got things sorted. Or rather the archticted did, I don’t really know what happened. All I know is now that the engineers from the timber frame company sent back some annotated drawings and all is now well with the foundation plan as we have it. Well until the next thing goes wrong anyway.

IMG_8770.PNG

<

The foundations go in

I’ve been meaning to write this for a while. It was going to be a story. But there’s so much going on and so I thought I’d just post some photos of the progress of the foundations.

IMG_6696.JPGMid June. Nothing started. But I walked across Scotland on a sort of birthday pilgrimage. And popped by to see the plot and the work at the plot next door while I was at it.

IMG_6903.JPG July: still no progress but a lovely few days at Cuil Bay in the holidays

IMG_7664.JPG

IMG_7665.JPG Start of September and the work starts. What was once a bog turns out to be a perfect building plot with bedrock right near the surface. Except in this corner which needed some concrete.

IMG_7731.JPG

IMG_7733.JPG End of September we visit and it starts to feel like we are getting somewhere.

IMG_8114.JPG

IMG_8115.JPG End October the screed has gone in and the walls complete and that is where it has stayed. Anytime now the concrete slab will go in, in preparation for the frame arriving!