Building has started at Cuil Bay. It seems a bit of a miracle (and this is just the first stage – the groundworks) but the digger actually made the first dig into the soil on 12 September. We might not have even submitted building control for the main bit of the building yet and have no view further than getting these foundations done while the weather is still dry. But we have STARTED BUILDING!!
the ground conditions are apparently pretty ideal says Stuart our contractor from SECarmichael Building, the slate bedrock is about a meter below the surface in most parts of the plot.
It’s only in this south east corner that the bedrock is at depth and we’ll need to stick a load of concrete in.
Apparently the neighbouring plot which was all dry and level and perfect-looking before the digging started was all gravel and sand underneath and whole truck loads of concrete needed to go in to stabilize enough for the foundations. On the other hand, my plot, that seemed all boggy and wet and was wall-to-wall rush and puddle, is apparently the better site with bedrock right underneath.
It’s certainly encouraging to know that all that bogginess was actually because the water had nowhere to drain to due to the bedrock.
I’m clinging to the good stuff especially with the long journey this has been and that it is, by no means, anywhere near the end.