A tale of four Builders. 

And now – a few blogs that have been sitting in my drafts for a while.  To begin, here’s one from August…

A quick guide to my builders ….

.
Builder #1 did the groundworks: foundations, drainage septic tank and is coming to do the landscaping and final stuff from drive etc. he also arranged the slater plumber electrician and underfloor heating and screed for me.

.
Builder #2 is Scotframe’s contractor for putting up the timber kits

.
Builder #3 has done the cladding and porches, firebox and a few other things

.
Builder #4 was doing plasterboarding and stairs…. (postscript: and now Builder3 is doing plaster boarding and stairs and everything else…)

.
‘It really isn’t how I would recommend building a house’ I said to the other customer in the builder’s office, ‘ in fact I wouldn’t wish it on my worst enemy’.

.
The other customer had come in to ask Builder 3 for a quote for building a whole house, but his wife was just looking for the kitchen. Builder 3 had looked round at me and asked whether I’d recommend piecing together lots of different builders and trades to build a house. Ho Ho, how we all laughed …. (in that way that you’d better laugh or you just might cry)

.
I was there in Builder 3’s office to discuss a few things. His company is doing the cladding of the house, the only person who could actually do the work in the timescale needed after Builder 2 let me down. And he’s also building the porches. So we had a bit of planning to do for that, but I also needed to discuss the fire boarding around the wood burning stove – which is inset into the wall. His company isn’t doing that piece of work. For reasons I am puzzling over, I gave that job, and the internal plaster boarding stairs etc, to another builder.

.
Builder 3 had already demonstrated a great interest in the stove type and set-up and had put a similar one into his own house, Builder 3 had done a great job of moving all the windows into the place they should have been in the frames (after a mess up by builder 2 – which Builder3 had noticed when he came to visit), Builder 3 had demonstrated his attention to detail in spades, And had gone beyond the call of duty in helping get the electricity supply in – although, come to think of it, that would have been a total disaster had Builder 1 not stepped in (but that’s another story related to me not double checking there was going to be someone site that day and then being in meetings all day unable to take calls…). So why would I switch to yet another builder?

.
Well, as I have mentioned before, builders seem quite busy around the area at the moment. There is so much building going on, it has been hard, in the rather ad hoc and ill-advised way I am building the house, to get people when I need them. And when someone is the only person quoting for a job, they know they are the only person quoting for a job, and you know as little about building as a house as I do, there is always the niggling worry that l would end up spending extra money (and I’m already haemorrhaging money like a bankrobber’s escape vehicle with the doors left open). So I had an idea. A friend’s partner is a builder, he lives in East Scotland, but perhaps he will look at the quote and tell me if it is roughly right.

.

So Builder 4 looked at the quote. He asked me a few questions, visited the house and said he’d do it and gave me a better quote. He would be living on site with the team, working long days, he said, and would get it done quicker. I was almost swayed. I didn’t ask if he knew what to do about the stove (despite the vast numbers of hours I had spent reading and researching about the right kind of stove and the stupendous complexities there appear to be). But the final thought was that I’d been finding it rather hard to pursued Builder 3 to make the hearth in the way I wanted it.

.

As previously reported, the ‘hearth-ache’  of trying to calculate where the hearth needs to go to satisfy building standards, limits over coridor widths, and to make an insulating constructional hearth, has been quite trying. On the day the stove was arriving I didn’t quite trust that the slab for the stove, which would mean we would have 125mm concrete under the stove, would be there and so I stopped into B&Q at 7am to buy an emergency back-up concrete paving slab and a few backup backup concrete paving slabs. While I was sitting by the sea (it being the only place with mobile phone coverage) and waiting for the lost stove guys to call (“I’m up a track at a locked gate and I can see some sheep and a mountain, do you know where I am?”), Builder 3 turned up in his van with the concrete slab I had asked for. It fitted perfectly. I decided not to mention all the emergency slabs in the back of my car.

.
So without properly thinking about it, and throwing intuition to the winds, I went with Builder 4, and ditched Builder 3. Although we’d all have to play happy families as Builder 3 would be working on the outside cladding and porches and Builder 4 on the inside. Fortunately that seemed to work OK, except Builder 4 would go home every time he perceived there would be some clash – e.g. moving the scaffolding – or if he was waiting on some work done by someone else (but omit to tell me or them what was needed). And even when there were no mitigating circumstances he would only be up on site for three days in a week (sometimes four).

.

It also became clear that there was a big question mark over how to sort out the stove. He wanted me to tell him how to do it and given my brain had already practically exploded trying to work out the constructional hearth stuff I wasn’t really in a fit state to work out the firebox stuff. When I said that Builder 4 had explained to me how to do it but I couldn’t quite gather the stoic determination to recall what he had said. He said, why don’t you get Builder 3 to do the work then?

.
Fortunately Builder 3, despite having being dumped for the new builder, was generously willing to help advise on various things, including the stove, which is why I happened to be in his office that morning lamenting my hopelessly naive way to build a house, and getting his advice on how to build the ruddy thing.

.

With the clarity of hindsight, see  blog, it is very apparent that taking up with Builder4 was the worst decision I made during the build. Probably even worse than  the decision to build the house in the first place.

.
Eventually I decide to bite the bullet and do something about it. I call builder3. ‘Look this is awkward’ I say, ‘but you know I dumped you for another builder? And it’s not quite working out with him, and I was wondering how you’d feel if I asked you to do some more work.’

.
Fortunately builder3 has a sense of humour.

.
So that’s Builders#3 and #4 covered. So what happened to Builders#1 and #2 then?

.

Well I would have loved for Builder#1 to do the whole build. Nothing is a problem for Builder#1. Need foundations finished by a certain date in the most torrential rain and horrific conditions? Don’t worry it will be done on time. Need someone on site to meet the man from building control at short notice? No problem, even though he’s not really involved with the build any more. Need someone to bring a telehandler to site to unload the plasterboard delivery? He’s there. Electricity company turn up on site to install a cable (next available date in 6 weeks) and no-one’s on site? Don’t worry, he’ll magically show up and get it sorted.

.

Until recently, ‘Ah, yes’ and ‘that will be fine’ were pretty much the only things that Builder 1 said to me. Occasionally, he would make suggestions on changing some part of the architects spec. But largely it was left up to me to warble away naively about stuff I know nothing about (namely building a house) in the silences. He’d agreed to doing the foundations, as he was working on the neighbouring plot at the time, but they had too many jobs on to take the build any further. From time to time I’d plead with him to come back to the building site, but to no avail. But despite not being able to take on the big jobs, he has been happy to help along the way, arranging the slating, plumbing and electricity and the underfloor heating and flow-screed.

.
And Builder#2? Well suffice to say he’s not being invited to the house warming party.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s