So now I am in charge of building this house what is the plan?
Well…..It may be because I am totally naive and know absolutely nothing about building houses but it seems to me that the process of building the house comes in three simple sections.
How hard can it be…?
Firstly the ground works, foundations, drainage and pipes and stuff.
Secondly: the frame. We are getting this made by Scotframe. It will have doors, windows, internal walls staircase, insulation and all, all prepared in the factory. It gets erected on site to wind and watertight in four days (FOUR DAYS?!) It then just needs the cladding and slates on.
Lastly: By then you’ve basically got something that looks like a house on the outside and you need all the stuff done on the inside: heating, wires, flooring, bathrooms, kitchen.
Does that sound right to you? It sounds simple enough doesn’t it?
Look I have organised loads of stuff in my life. Once, when my youngest was a baby I arranged for some fallen trees on Arran to be transported back to Glasgow, made into a boat by the amazing Galgael and then sailed back to Arran where it circumnavigated the island stopping at four ports on the way to different festivities and events. I keep the family logistics running, I run the Naseby Park Cherry Blossom Festival, at work I organize everything all the time. When I have a few moments free I invent new things to organize to fill the time like complex multi-day walks following a massive birthday celebration or a business doing ceilidhs to disco music.
I think I should be OK with building this house. I hope …. Watch this space.
Pingback: Builders and Building Blog (part 1) | Cuil Things to do
Pingback: Having EPC Difficulties | Cuil Things to do